File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Article: Parameters governing the selection of procurement system - An empirical survey

TitleParameters governing the selection of procurement system - An empirical survey
Authors
KeywordsConstruction industry
Procurement
Project management
Issue Date2003
PublisherEmerald Group Publishing Limited. The Journal's web site is located at http://www.emeraldinsight.com/ecam.htm
Citation
Engineering, Construction And Architectural Management, 2003, v. 10 n. 3, p. 209-218 How to Cite?
AbstractThe lack of structured procedures, based on good information, for the selection of construction procurement system sometimes inhibits the opportunity for clients to choose a procurement option in a fully informed manner. The selection and use of an unsuitable procurement approach could eventually lead to project failure. To formalise the procurement selection procedures, clients should establish a set of appropriate procurement selection parameters (PSPs) based on their distinctive characteristics and objectives, project requirements, and external environment. In this paper, a list of 34 PSPs was drawn up according to the findings of researchers in procurement selection. An empirical study was carried out in Australia with clients and project managers to unveil the importance and interrelationships of the identified PSPs. The results indicate that the perception of clients and project managers on the importance of PSPs was generally consistent that underlying relationships do exist among parameters, and there is a need for clients to ensure that the interrelated PSPs are not overlooked when assessing the suitability of construction procurement systems.
Persistent Identifierhttp://hdl.handle.net/10722/70683
ISSN
2021 Impact Factor: 3.850
2020 SCImago Journal Rankings: 0.585
References

 

DC FieldValueLanguage
dc.contributor.authorLuu, DTen_HK
dc.contributor.authorNg, STen_HK
dc.contributor.authorChen, SEen_HK
dc.date.accessioned2010-09-06T06:25:10Z-
dc.date.available2010-09-06T06:25:10Z-
dc.date.issued2003en_HK
dc.identifier.citationEngineering, Construction And Architectural Management, 2003, v. 10 n. 3, p. 209-218en_HK
dc.identifier.issn0969-9988en_HK
dc.identifier.urihttp://hdl.handle.net/10722/70683-
dc.description.abstractThe lack of structured procedures, based on good information, for the selection of construction procurement system sometimes inhibits the opportunity for clients to choose a procurement option in a fully informed manner. The selection and use of an unsuitable procurement approach could eventually lead to project failure. To formalise the procurement selection procedures, clients should establish a set of appropriate procurement selection parameters (PSPs) based on their distinctive characteristics and objectives, project requirements, and external environment. In this paper, a list of 34 PSPs was drawn up according to the findings of researchers in procurement selection. An empirical study was carried out in Australia with clients and project managers to unveil the importance and interrelationships of the identified PSPs. The results indicate that the perception of clients and project managers on the importance of PSPs was generally consistent that underlying relationships do exist among parameters, and there is a need for clients to ensure that the interrelated PSPs are not overlooked when assessing the suitability of construction procurement systems.en_HK
dc.languageengen_HK
dc.publisherEmerald Group Publishing Limited. The Journal's web site is located at http://www.emeraldinsight.com/ecam.htmen_HK
dc.relation.ispartofEngineering, Construction and Architectural Managementen_HK
dc.subjectConstruction industryen_HK
dc.subjectProcurementen_HK
dc.subjectProject managementen_HK
dc.titleParameters governing the selection of procurement system - An empirical surveyen_HK
dc.typeArticleen_HK
dc.identifier.openurlhttp://library.hku.hk:4550/resserv?sid=HKU:IR&issn=0969-9988&volume=10&issue=3&spage=209&epage=218&date=2003&atitle=Parameters+governing+the+selection+of+procurement+system+-+an+empirical+surveyen_HK
dc.identifier.emailNg, ST:tstng@hkucc.hku.hken_HK
dc.identifier.authorityNg, ST=rp00158en_HK
dc.description.naturelink_to_subscribed_fulltext-
dc.identifier.doi10.1108/09699980310478458en_HK
dc.identifier.scopuseid_2-s2.0-3242685861en_HK
dc.identifier.hkuros91787en_HK
dc.relation.referenceshttp://www.scopus.com/mlt/select.url?eid=2-s2.0-3242685861&selection=ref&src=s&origin=recordpageen_HK
dc.identifier.volume10en_HK
dc.identifier.issue3en_HK
dc.identifier.spage209en_HK
dc.identifier.epage218en_HK
dc.publisher.placeUnited Kingdomen_HK
dc.identifier.scopusauthoridLuu, DT=6701536744en_HK
dc.identifier.scopusauthoridNg, ST=7403358853en_HK
dc.identifier.scopusauthoridChen, SE=7410252773en_HK
dc.identifier.issnl0969-9988-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats