Showing results 1 to 6 of 6
Title | Author(s) | Issue Date | |
---|---|---|---|
Allocation of construction resources through a pull-driven approach Journal:Construction Innovation – Information, Process, Management | 2013 | ||
Applying a genetic algorithm-based multiobjective approach for time-cost optimization Journal:Journal of Construction Engineering and Management | 2004 | ||
Applying genetic algorithm techniques for time-cost optimization Proceeding/Conference:ARCOM 18th Annual Conference, 2-4 September, 2002 | 2002 | ||
Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization Journal:Journal of Construction Engineering and Management | 2005 | ||
GA-Based Multiobjective Technique for Multi-Resource Leveling Proceeding/Conference:Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress | 2003 | ||
Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front Journal:Journal of Construction Engineering and Management | 2005 |