File Download
There are no files associated with this item.
Links for fulltext
(May Require Subscription)
- Publisher Website: 10.1061/(ASCE)0733-9364(2002)128:2(155)
- Scopus: eid_2-s2.0-13944255057
- WOS: WOS:000174956400008
- Find via
Supplementary
- Citations:
- Appears in Collections:
Article: Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong
Title | Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong |
---|---|
Authors | |
Keywords | Build/Operate/Transfer Hong Kong Tunnel Construction |
Issue Date | 2002 |
Publisher | American Society of Civil Engineers. The Journal's web site is located at http://www.pubs.asce.org/journals/co.html |
Citation | Journal Of Construction Engineering And Management, 2002, v. 128 n. 2, p. 155-163 How to Cite? |
Abstract | A significant realignment of risks between project participants is a fundamental facet of the new procurement paradigm of BOT (build-operate- transfer). A BOT concessionaire assumes far more and deeper risks than a contractor. One critical contributor to the success of a BOT project is the selection of an appropriate concessionaire who has the necessary capacity to provide the best overall deal throughout the build-operate-transfer process. However, various BOT-type procurement protocols are not yet proven and are still being tried and tested. Many countries are at the lower ends of their learning curves. Therefore, there is a need to benchmark the best practices that have been emerging. The Hong Kong government has developed a well-structured concessionaire selection framework supported by the Kepner-Tregoe decision analysis technique. This paper analyzes and draws experiences and lessons from this concessionaire selection practice. Current concessionaire selection practices worldwide are also discussed with a view to improve the procurement process of regions lacking in such experiences or expertise. |
Persistent Identifier | http://hdl.handle.net/10722/150273 |
ISSN | 2023 Impact Factor: 4.1 2023 SCImago Journal Rankings: 1.071 |
ISI Accession Number ID | |
References |
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Zhang, XQ | en_US |
dc.contributor.author | Kumaraswamy, MM | en_US |
dc.contributor.author | Zheng, W | en_US |
dc.contributor.author | Palaneeswaran, E | en_US |
dc.date.accessioned | 2012-06-26T06:02:55Z | - |
dc.date.available | 2012-06-26T06:02:55Z | - |
dc.date.issued | 2002 | en_US |
dc.identifier.citation | Journal Of Construction Engineering And Management, 2002, v. 128 n. 2, p. 155-163 | en_US |
dc.identifier.issn | 0733-9364 | en_US |
dc.identifier.uri | http://hdl.handle.net/10722/150273 | - |
dc.description.abstract | A significant realignment of risks between project participants is a fundamental facet of the new procurement paradigm of BOT (build-operate- transfer). A BOT concessionaire assumes far more and deeper risks than a contractor. One critical contributor to the success of a BOT project is the selection of an appropriate concessionaire who has the necessary capacity to provide the best overall deal throughout the build-operate-transfer process. However, various BOT-type procurement protocols are not yet proven and are still being tried and tested. Many countries are at the lower ends of their learning curves. Therefore, there is a need to benchmark the best practices that have been emerging. The Hong Kong government has developed a well-structured concessionaire selection framework supported by the Kepner-Tregoe decision analysis technique. This paper analyzes and draws experiences and lessons from this concessionaire selection practice. Current concessionaire selection practices worldwide are also discussed with a view to improve the procurement process of regions lacking in such experiences or expertise. | en_US |
dc.language | eng | en_US |
dc.publisher | American Society of Civil Engineers. The Journal's web site is located at http://www.pubs.asce.org/journals/co.html | en_US |
dc.relation.ispartof | Journal of Construction Engineering and Management | en_US |
dc.rights | Journal of Construction Engineering and Management. Copyright © American Society of Civil Engineers. | - |
dc.subject | Build/Operate/Transfer | en_US |
dc.subject | Hong Kong | en_US |
dc.subject | Tunnel Construction | en_US |
dc.title | Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong | en_US |
dc.type | Article | en_US |
dc.identifier.email | Kumaraswamy, MM:mohan@hkucc.hku.hk | en_US |
dc.identifier.authority | Kumaraswamy, MM=rp00126 | en_US |
dc.description.nature | link_to_subscribed_fulltext | en_US |
dc.identifier.doi | 10.1061/(ASCE)0733-9364(2002)128:2(155) | en_US |
dc.identifier.scopus | eid_2-s2.0-13944255057 | en_US |
dc.identifier.hkuros | 72499 | - |
dc.relation.references | http://www.scopus.com/mlt/select.url?eid=2-s2.0-13944255057&selection=ref&src=s&origin=recordpage | en_US |
dc.identifier.volume | 128 | en_US |
dc.identifier.issue | 2 | en_US |
dc.identifier.spage | 155 | en_US |
dc.identifier.epage | 163 | en_US |
dc.identifier.isi | WOS:000174956400008 | - |
dc.publisher.place | United States | en_US |
dc.identifier.scopusauthorid | Zhang, XQ=16647701900 | en_US |
dc.identifier.scopusauthorid | Kumaraswamy, MM=35566270600 | en_US |
dc.identifier.scopusauthorid | Zheng, W=7403566206 | en_US |
dc.identifier.scopusauthorid | Palaneeswaran, E=6603323319 | en_US |
dc.identifier.issnl | 0733-9364 | - |