File Download
There are no files associated with this item.
Supplementary
-
Citations:
- Scopus: 0
- Appears in Collections:
Conference Paper: CONTRACTOR AS DESIGNER.
Title | CONTRACTOR AS DESIGNER. |
---|---|
Authors | |
Issue Date | 1986 |
Citation | Reports Of The Working Commissions (International Association For Bridge And Structural Engineerin, 1986, v. 53, p. 169-175 How to Cite? |
Abstract | The paper investigates the performance of Design-Build contractors compared with Traditional, Architect-lead projects. The paper initially investigates the theoretical advantages and disadvantages of contractor designed projects as opposed to architect designed projects. The contractors method of working and planning is then analysed and the results of site based analysis of delays and productivity are reported. The paper concludes with an analysis of the time and cost performance of a number of contractor-designed projects and the response of client organisations to this performance. |
Persistent Identifier | http://hdl.handle.net/10722/169113 |
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Rowlinson, Steve | en_US |
dc.contributor.author | Langford, Dave | en_US |
dc.date.accessioned | 2012-10-08T03:44:40Z | - |
dc.date.available | 2012-10-08T03:44:40Z | - |
dc.date.issued | 1986 | en_US |
dc.identifier.citation | Reports Of The Working Commissions (International Association For Bridge And Structural Engineerin, 1986, v. 53, p. 169-175 | en_US |
dc.identifier.uri | http://hdl.handle.net/10722/169113 | - |
dc.description.abstract | The paper investigates the performance of Design-Build contractors compared with Traditional, Architect-lead projects. The paper initially investigates the theoretical advantages and disadvantages of contractor designed projects as opposed to architect designed projects. The contractors method of working and planning is then analysed and the results of site based analysis of delays and productivity are reported. The paper concludes with an analysis of the time and cost performance of a number of contractor-designed projects and the response of client organisations to this performance. | en_US |
dc.language | eng | en_US |
dc.relation.ispartof | Reports of the Working Commissions (International Association for Bridge and Structural Engineerin | en_US |
dc.title | CONTRACTOR AS DESIGNER. | en_US |
dc.type | Conference_Paper | en_US |
dc.identifier.email | Rowlinson, Steve:hrecsmr@hkucc.hku.hk | en_US |
dc.identifier.authority | Rowlinson, Steve=rp01020 | en_US |
dc.description.nature | link_to_subscribed_fulltext | en_US |
dc.identifier.scopus | eid_2-s2.0-0022937122 | en_US |
dc.identifier.volume | 53 | en_US |
dc.identifier.spage | 169 | en_US |
dc.identifier.epage | 175 | en_US |
dc.identifier.scopusauthorid | Rowlinson, Steve=7003696228 | en_US |
dc.identifier.scopusauthorid | Langford, Dave=7005059237 | en_US |