Article: Impact of stress on the performance of construction project managers

TitleImpact of stress on the performance of construction project managers
Authors
KeywordsConstruction management
Project management
Managers
Personnel management
Issue Date2008
Citation
Journal of Construction Engineering and Management, 2008, v. 134, n. 8, p. 644-652 How to Cite?
AbstractThe work of construction project managers (CPMs) is often highly stressful, due to time pressures, and due to the uncertainties and the dynamic social structure involved in construction projects. This study aims to investigate the impact of stress on the performance of CPMs. Correlation analysis and structural equation modeling are employed to uncover the relationships between different types of stress (i.e., objective stress, burnout, and physiological stress) and the work performances (i.e., task performance, interpersonal performance, and organizational performance) of CPMs. Data were collected from 108 CPMs who work in a variety of construction sectors, including prime contractors, subcontractors, developers, consultant firms, and the public sector. Results showed that (1) objective stress reduces the task performance of CPMs while burnout can have a positive effect on it; (2) interpersonal performance is maximized with a moderate level of objective stress (i.e., an inverted-U-shaped relationship between these two variables) and increases in line with the improvement of the task performance of individuals; and (3) organizational performance has U-shaped relationships with both burnout and physiological stresses and is worsened by objective stress. Last, it is suggested to stakeholders that regular reviews of job allocation, stress appraisals, stress management workshops, group or individual counseling, and psychological treatment or physiotherapy be carried out to optimize the stress and the performance of CPMs. © 2008 ASCE.
Persistent Identifierhttp://hdl.handle.net/10722/262736
ISSN
2021 Impact Factor: 5.292
2020 SCImago Journal Rankings: 0.967
ISI Accession Number ID

 

DC FieldValueLanguage
dc.contributor.authorLeung, Mei Yung-
dc.contributor.authorChan, Yee Shan-
dc.contributor.authorOlomolaiye, Paul-
dc.date.accessioned2018-10-08T02:46:53Z-
dc.date.available2018-10-08T02:46:53Z-
dc.date.issued2008-
dc.identifier.citationJournal of Construction Engineering and Management, 2008, v. 134, n. 8, p. 644-652-
dc.identifier.issn0733-9364-
dc.identifier.urihttp://hdl.handle.net/10722/262736-
dc.description.abstractThe work of construction project managers (CPMs) is often highly stressful, due to time pressures, and due to the uncertainties and the dynamic social structure involved in construction projects. This study aims to investigate the impact of stress on the performance of CPMs. Correlation analysis and structural equation modeling are employed to uncover the relationships between different types of stress (i.e., objective stress, burnout, and physiological stress) and the work performances (i.e., task performance, interpersonal performance, and organizational performance) of CPMs. Data were collected from 108 CPMs who work in a variety of construction sectors, including prime contractors, subcontractors, developers, consultant firms, and the public sector. Results showed that (1) objective stress reduces the task performance of CPMs while burnout can have a positive effect on it; (2) interpersonal performance is maximized with a moderate level of objective stress (i.e., an inverted-U-shaped relationship between these two variables) and increases in line with the improvement of the task performance of individuals; and (3) organizational performance has U-shaped relationships with both burnout and physiological stresses and is worsened by objective stress. Last, it is suggested to stakeholders that regular reviews of job allocation, stress appraisals, stress management workshops, group or individual counseling, and psychological treatment or physiotherapy be carried out to optimize the stress and the performance of CPMs. © 2008 ASCE.-
dc.languageeng-
dc.relation.ispartofJournal of Construction Engineering and Management-
dc.subjectConstruction management-
dc.subjectProject management-
dc.subjectManagers-
dc.subjectPersonnel management-
dc.titleImpact of stress on the performance of construction project managers-
dc.typeArticle-
dc.description.naturelink_to_subscribed_fulltext-
dc.identifier.doi10.1061/(ASCE)0733-9364(2008)134:8(644)-
dc.identifier.scopuseid_2-s2.0-47749097934-
dc.identifier.volume134-
dc.identifier.issue8-
dc.identifier.spage644-
dc.identifier.epage652-
dc.identifier.isiWOS:000257762400009-
dc.identifier.issnl0733-9364-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats