File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)

Article: An Internet of Things-enabled BIM platform for modular integrated construction: A case study in Hong Kong

TitleAn Internet of Things-enabled BIM platform for modular integrated construction: A case study in Hong Kong
Authors
KeywordsBuilding Information Modelling (BIM)
Modular Integrated Construction (MiC)
Prefabrication
Internet of Things
Issue Date2019
PublisherPergamon. The Journal's web site is located at http://www.elsevier.com/locate/aei
Citation
Advanced Engineering Informatics, 2019, v. 42, p. article no. 100997 How to Cite?
AbstractIn recent years, Building Information Modelling (BIM) has been acting an important role in the delivery of Modular Integrated Construction (MiC) project. However, the full potential of BIM to MiC project cannot be realized without accurate information collection, timely information exchange, and automatic decision support throughout the project life cycle. In order to fulfil such requirements, this paper aims to develop an Internet of Things-enabled BIM platform (IBIMP) for the MiC project. A real-life project located in Hong Kong were deeply explored for developing the platform. The IBIMP consists of smart construction objects (SCOs) equipped with smart trinity tag (STT) and GPS sensor, smart gateway system, data source management service, location-based service, rule-based progress control service, as well as decision support services for prefabrication production, transportation, and on-site assembly processes. With the combination of advanced Internet of Things (IoT) technology and BIM technology, the barriers that hamper the possible functions of BIM can be overcame. By using application scenarios of a subsided sale flats MiC project in Hong Kong as examples, this study demonstrates how problems encountered by independent stakeholders such as inconvenient data collection, lack of automatic decision support, and incomplete information can be addressed by the IBIMP.
Persistent Identifierhttp://hdl.handle.net/10722/294621
ISSN
2023 Impact Factor: 8.0
2023 SCImago Journal Rankings: 1.731
ISI Accession Number ID

 

DC FieldValueLanguage
dc.contributor.authorZhai, Y-
dc.contributor.authorChen, K-
dc.contributor.authorZhou, JX-
dc.contributor.authorCao, J-
dc.contributor.authorLyu, Z-
dc.contributor.authorJin, X-
dc.contributor.authorShen, GQP-
dc.contributor.authorLu, W-
dc.contributor.authorHuang, GQ-
dc.date.accessioned2020-12-08T07:39:33Z-
dc.date.available2020-12-08T07:39:33Z-
dc.date.issued2019-
dc.identifier.citationAdvanced Engineering Informatics, 2019, v. 42, p. article no. 100997-
dc.identifier.issn1474-0346-
dc.identifier.urihttp://hdl.handle.net/10722/294621-
dc.description.abstractIn recent years, Building Information Modelling (BIM) has been acting an important role in the delivery of Modular Integrated Construction (MiC) project. However, the full potential of BIM to MiC project cannot be realized without accurate information collection, timely information exchange, and automatic decision support throughout the project life cycle. In order to fulfil such requirements, this paper aims to develop an Internet of Things-enabled BIM platform (IBIMP) for the MiC project. A real-life project located in Hong Kong were deeply explored for developing the platform. The IBIMP consists of smart construction objects (SCOs) equipped with smart trinity tag (STT) and GPS sensor, smart gateway system, data source management service, location-based service, rule-based progress control service, as well as decision support services for prefabrication production, transportation, and on-site assembly processes. With the combination of advanced Internet of Things (IoT) technology and BIM technology, the barriers that hamper the possible functions of BIM can be overcame. By using application scenarios of a subsided sale flats MiC project in Hong Kong as examples, this study demonstrates how problems encountered by independent stakeholders such as inconvenient data collection, lack of automatic decision support, and incomplete information can be addressed by the IBIMP.-
dc.languageeng-
dc.publisherPergamon. The Journal's web site is located at http://www.elsevier.com/locate/aei-
dc.relation.ispartofAdvanced Engineering Informatics-
dc.subjectBuilding Information Modelling (BIM)-
dc.subjectModular Integrated Construction (MiC)-
dc.subjectPrefabrication-
dc.subjectInternet of Things-
dc.titleAn Internet of Things-enabled BIM platform for modular integrated construction: A case study in Hong Kong-
dc.typeArticle-
dc.identifier.emailLu, W: wilsonlu@hku.hk-
dc.identifier.emailHuang, GQ: gqhuang@hku.hk-
dc.identifier.authorityLu, W=rp01362-
dc.identifier.authorityHuang, GQ=rp00118-
dc.description.naturelink_to_subscribed_fulltext-
dc.identifier.doi10.1016/j.aei.2019.100997-
dc.identifier.scopuseid_2-s2.0-85074177142-
dc.identifier.hkuros320524-
dc.identifier.volume42-
dc.identifier.spagearticle no. 100997-
dc.identifier.epagearticle no. 100997-
dc.identifier.isiWOS:000501389000062-
dc.publisher.placeUnited Kingdom-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats