File Download
There are no files associated with this item.
Supplementary
-
Citations:
- Appears in Collections:
Conference Paper: The barriers and strategies of conducting on-site sorting of construction waste: a case study of Suzhou
Title | The barriers and strategies of conducting on-site sorting of construction waste: a case study of Suzhou |
---|---|
Authors | |
Issue Date | 2019 |
Citation | CRIOCM The 24th Internationall Symposium on Advancement of Construction Management and Real Estate (CRIOCM2019), Chongqing, China, 29 November – 2 December 2019 How to Cite? |
Abstract | With the rapid development of economy and society in the past two decades, China is confronted with unprecedented pressure from the public demanding for sustainability. Construction waste, as a chief culprit undermining the sustainability has received increasing attention. Construction waste issues in China are particularly severe due to the massive construction waste generated on the one hand and poor construction waste management on the other hand. On-site sorting of construction waste is an effective measure of construction waste management to increase the reuse and recycling rate of construction waste. However, the implementation level of on-site sorting of construction waste is rather low. There is a pressing need to investigate the barriers against it. Therefore, this study analyzes the barriers of conducting on-site sorting of construction waste with a case study of Suzhou. The results indicate that the barriers include (1) lack of on-site management of sorting, and (2) low level of environmental awareness for construction company, (1) lack of on-site management, and (2) lack of advanced demolition technologies for demolition & transport company, and (1) lack of a mature market for recycled materials, and (2) insufficient technologies for construction waste recycling company. Based on the barriers identified, three targeted strategies are also proposed in this study, including improving environmental awareness, enhancing supervision of on-site sorting of construction waste, and providing some economic incentives. The research deliverables of this study are of benefit to researchers, practitioners and government to devise more evidence-based strategies to holistically improve construction waste management performance in China and beyond. |
Description | Session 5 - CM09: Green building Organizers:The Chinese Research Institute of Construction Management (CRIOCM) in collaboration with Faculty of Built Environment, Chongqing University (CQU) |
Persistent Identifier | http://hdl.handle.net/10722/294648 |
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Bao, Z | - |
dc.contributor.author | Lu, WW | - |
dc.contributor.author | Chi, B | - |
dc.contributor.author | Hao, J | - |
dc.contributor.author | Miao, P | - |
dc.contributor.author | Gao, X | - |
dc.contributor.author | Zhao, Z | - |
dc.contributor.author | Cheng, B | - |
dc.date.accessioned | 2020-12-08T07:39:55Z | - |
dc.date.available | 2020-12-08T07:39:55Z | - |
dc.date.issued | 2019 | - |
dc.identifier.citation | CRIOCM The 24th Internationall Symposium on Advancement of Construction Management and Real Estate (CRIOCM2019), Chongqing, China, 29 November – 2 December 2019 | - |
dc.identifier.uri | http://hdl.handle.net/10722/294648 | - |
dc.description | Session 5 - CM09: Green building | - |
dc.description | Organizers:The Chinese Research Institute of Construction Management (CRIOCM) in collaboration with Faculty of Built Environment, Chongqing University (CQU) | - |
dc.description.abstract | With the rapid development of economy and society in the past two decades, China is confronted with unprecedented pressure from the public demanding for sustainability. Construction waste, as a chief culprit undermining the sustainability has received increasing attention. Construction waste issues in China are particularly severe due to the massive construction waste generated on the one hand and poor construction waste management on the other hand. On-site sorting of construction waste is an effective measure of construction waste management to increase the reuse and recycling rate of construction waste. However, the implementation level of on-site sorting of construction waste is rather low. There is a pressing need to investigate the barriers against it. Therefore, this study analyzes the barriers of conducting on-site sorting of construction waste with a case study of Suzhou. The results indicate that the barriers include (1) lack of on-site management of sorting, and (2) low level of environmental awareness for construction company, (1) lack of on-site management, and (2) lack of advanced demolition technologies for demolition & transport company, and (1) lack of a mature market for recycled materials, and (2) insufficient technologies for construction waste recycling company. Based on the barriers identified, three targeted strategies are also proposed in this study, including improving environmental awareness, enhancing supervision of on-site sorting of construction waste, and providing some economic incentives. The research deliverables of this study are of benefit to researchers, practitioners and government to devise more evidence-based strategies to holistically improve construction waste management performance in China and beyond. | - |
dc.language | eng | - |
dc.relation.ispartof | The 24th International Symposium on Advancement of Construction Management and Real Estate (CRIOCM2019) | - |
dc.title | The barriers and strategies of conducting on-site sorting of construction waste: a case study of Suzhou | - |
dc.type | Conference_Paper | - |
dc.identifier.email | Lu, WW: wilsonlu@hku.hk | - |
dc.identifier.authority | Lu, WW=rp01362 | - |
dc.identifier.hkuros | 320532 | - |