File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Conference Paper: Constructing a building information modelling (BIM) execution plan for quantity surveying practice

TitleConstructing a building information modelling (BIM) execution plan for quantity surveying practice
Authors
KeywordsBIM
Quantity surveying
Construction industry
Execution plan
Issue Date2021
PublisherSpringer.
Citation
23rd International Symposium on Advancement of Construction Management and Real Estate (CRIOCM2018), Guiyang, China, 24-27 August 2018. In Long, F, Zheng, S, Wu, Y, et al. (Eds.), Proceedings of the 23rd International Symposium on Advancement of Construction Management and Real Estate, p. 778-790 How to Cite?
AbstractThe quantity surveyor is an essential part of every major construction project, estimating costs, tendering documents and payments, and informing clients’ and other project managers’ decision-making during the construction lifecycle. However, existing quantity surveying (QS) procedure relies on tedious calculation and faces intense time pressures to turnaround work, which exacerbate the likelihood of circulating inaccurate estimates. Building Information Modelling (BIM) allows the virtual linking of cost to design elements, which enables semi-automatic computation of overall cost at various project stages and has the potential to enhance both the working efficiency and accuracy of QS tasks. Given the growing interest in implementing BIM into daily QS practice, this paper outlines a comprehensive BIM execution plan around QS. After addressing the benefits and pitfalls that may arise at each stage in the construction lifecycle, a description and analysis of a real-life application of QS-BIM is provided. The case’s BIM software, embedded with local measurement rules, helped produce considerably precise quantity take-offs.
Persistent Identifierhttp://hdl.handle.net/10722/322671

 

DC FieldValueLanguage
dc.contributor.authorWang, J-
dc.contributor.authorZetkulic, A-
dc.contributor.authorLu, WW-
dc.date.accessioned2022-11-14T08:29:48Z-
dc.date.available2022-11-14T08:29:48Z-
dc.date.issued2021-
dc.identifier.citation23rd International Symposium on Advancement of Construction Management and Real Estate (CRIOCM2018), Guiyang, China, 24-27 August 2018. In Long, F, Zheng, S, Wu, Y, et al. (Eds.), Proceedings of the 23rd International Symposium on Advancement of Construction Management and Real Estate, p. 778-790-
dc.identifier.urihttp://hdl.handle.net/10722/322671-
dc.description.abstractThe quantity surveyor is an essential part of every major construction project, estimating costs, tendering documents and payments, and informing clients’ and other project managers’ decision-making during the construction lifecycle. However, existing quantity surveying (QS) procedure relies on tedious calculation and faces intense time pressures to turnaround work, which exacerbate the likelihood of circulating inaccurate estimates. Building Information Modelling (BIM) allows the virtual linking of cost to design elements, which enables semi-automatic computation of overall cost at various project stages and has the potential to enhance both the working efficiency and accuracy of QS tasks. Given the growing interest in implementing BIM into daily QS practice, this paper outlines a comprehensive BIM execution plan around QS. After addressing the benefits and pitfalls that may arise at each stage in the construction lifecycle, a description and analysis of a real-life application of QS-BIM is provided. The case’s BIM software, embedded with local measurement rules, helped produce considerably precise quantity take-offs.-
dc.languageeng-
dc.publisherSpringer.-
dc.relation.ispartofProceedings of the 23rd International Symposium on Advancement of Construction Management and Real Estate-
dc.rightsThis version of the article has been accepted for publication, after peer review (when applicable) and is subject to Springer Nature’s AM terms of use, but is not the Version of Record and does not reflect post-acceptance improvements, or any corrections. The Version of Record is available online at: https://doi.org/[insert DOI]-
dc.subjectBIM-
dc.subjectQuantity surveying-
dc.subjectConstruction industry-
dc.subjectExecution plan-
dc.titleConstructing a building information modelling (BIM) execution plan for quantity surveying practice-
dc.typeConference_Paper-
dc.identifier.emailLu, WW: wilsonlu@hku.hk-
dc.identifier.authorityLu, WW=rp01362-
dc.identifier.doi10.1007/978-981-15-3977-0_59-
dc.identifier.hkuros341719-
dc.identifier.spage778-
dc.identifier.epage790-
dc.publisher.placeSingapore-
dc.identifier.eisbn9789811539770-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats