File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Article: Corrected Aggregate Workload approach on order release by considering job’s routing position induced variable indirect load

TitleCorrected Aggregate Workload approach on order release by considering job’s routing position induced variable indirect load
Authors
KeywordsCorrected Aggregate Workload
Indirect workload
Order release
Workload Control
Issue Date24-May-2024
PublisherEmerald
Citation
Industrial Management & Data Systems, 2024 How to Cite?
Abstract

Purpose: Workload contribution calculation approaches in the existing literature overestimate or underestimate indirect workload, which increases both workload fluctuation and shop floor throughput performance. This study optimizes a Corrected Aggregate Workload (CAW) approach to control the workload contribution of workstations and Work In Progress (WIP) levels, thereby improving the shop floor throughput performance. Design/methodology/approach: This study adopts simulation experiment by SimPy, and experimental factors are: (1) two workload contribution methods (CAW method and considering Position Corrected Aggregate Workload [PCAW] method); (2) two release methods (LUMS COR release and immediate release); (3) eleven workload norms for LUMS COR release (from 7- to 15-time units), and infinite workload norm for immediate release; and (4) two dispatching rules (First Come First Served, FCFS and Operation Due Date, ODD). Each scenario is replicated 100 times, and for each replication data are collected for 10,000 time units, being the warm-up period set to 3,000-time units. Findings: The results of this study confirm that the PCAW calculation method outperforms the CAW method, especially during higher workload norm levels. The PCAW method is considered the better solution in practice due to its excellent performance in terms of percentage tardiness and mean tardiness time. The efficient workload contribution approach, as discussed in this study, has the potential to offset delivery performance loss that results from throughput performance loss. Originality/value: This study proposes a novel approach that considers the workstations’ position in the routing of the job and the position of jobs CAW method. The results demonstrated that it allows shop floor throughput time to be short and feasible. It controls WIP by workload contribution of workstations, resulting in a lean shop floor. Therefore, workload contribution calculation is of particular significance for high-variety Make-To-Order (MTO) companies.


Persistent Identifierhttp://hdl.handle.net/10722/350922
ISSN
2023 Impact Factor: 4.2
2023 SCImago Journal Rankings: 1.207

 

DC FieldValueLanguage
dc.contributor.authorYuan, Mingze-
dc.contributor.authorMa, Lin-
dc.contributor.authorQu, Ting-
dc.contributor.authorThürer, Matthias-
dc.contributor.authorHuang, George Q-
dc.date.accessioned2024-11-06T00:30:40Z-
dc.date.available2024-11-06T00:30:40Z-
dc.date.issued2024-05-24-
dc.identifier.citationIndustrial Management & Data Systems, 2024-
dc.identifier.issn0263-5577-
dc.identifier.urihttp://hdl.handle.net/10722/350922-
dc.description.abstract<p>Purpose: Workload contribution calculation approaches in the existing literature overestimate or underestimate indirect workload, which increases both workload fluctuation and shop floor throughput performance. This study optimizes a Corrected Aggregate Workload (CAW) approach to control the workload contribution of workstations and Work In Progress (WIP) levels, thereby improving the shop floor throughput performance. Design/methodology/approach: This study adopts simulation experiment by SimPy, and experimental factors are: (1) two workload contribution methods (CAW method and considering Position Corrected Aggregate Workload [PCAW] method); (2) two release methods (LUMS COR release and immediate release); (3) eleven workload norms for LUMS COR release (from 7- to 15-time units), and infinite workload norm for immediate release; and (4) two dispatching rules (First Come First Served, FCFS and Operation Due Date, ODD). Each scenario is replicated 100 times, and for each replication data are collected for 10,000 time units, being the warm-up period set to 3,000-time units. Findings: The results of this study confirm that the PCAW calculation method outperforms the CAW method, especially during higher workload norm levels. The PCAW method is considered the better solution in practice due to its excellent performance in terms of percentage tardiness and mean tardiness time. The efficient workload contribution approach, as discussed in this study, has the potential to offset delivery performance loss that results from throughput performance loss. Originality/value: This study proposes a novel approach that considers the workstations’ position in the routing of the job and the position of jobs CAW method. The results demonstrated that it allows shop floor throughput time to be short and feasible. It controls WIP by workload contribution of workstations, resulting in a lean shop floor. Therefore, workload contribution calculation is of particular significance for high-variety Make-To-Order (MTO) companies.</p>-
dc.languageeng-
dc.publisherEmerald-
dc.relation.ispartofIndustrial Management & Data Systems-
dc.rightsThis work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.-
dc.subjectCorrected Aggregate Workload-
dc.subjectIndirect workload-
dc.subjectOrder release-
dc.subjectWorkload Control-
dc.titleCorrected Aggregate Workload approach on order release by considering job’s routing position induced variable indirect load-
dc.typeArticle-
dc.identifier.doi10.1108/IMDS-08-2023-0598-
dc.identifier.scopuseid_2-s2.0-85193983908-
dc.identifier.eissn0263-5577-
dc.identifier.issnl0263-5577-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats