File Download

There are no files associated with this item.

  Links for fulltext
     (May Require Subscription)
Supplementary

Article: Crew scheduling of light rail transit in Hong Kong: From modeling to implementation

TitleCrew scheduling of light rail transit in Hong Kong: From modeling to implementation
Authors
KeywordsCrew scheduling
Heuristics
Optimization modeling
Issue Date1998
PublisherPergamon. The Journal's web site is located at http://www.elsevier.com/locate/cor
Citation
Computers And Operations Research, 1998, v. 25 n. 11, p. 887-894 How to Cite?
AbstractThis work concerns the problem of crew scheduling for the Hong Kong Light Rail Transit (LRT), which together with Heavy Rail Transit, makes up the two divisions of Kowloon-Canton Railway Corporation. As of early 1996, LRT operates eight routes, two train depots and 57 stations on its operational network. It is rapidly expanding on routes, capacities and territorial coverage, hence pressing needs for timely constructions of crew schedules whenever passenger demand variations necessitate modifications in train timetables, typically every 3-4 months. Computer-assisted manual solutions from old software can take up to 1 month of painstaking work. Our project aims at automating this complex schedule construction, adopting a novel optimization modeling approach amenable for decomposition into separate solution stages by network and heuristics algorithms. The entire crew schedule can be constructed iteratively in less than half an hour on a PC. The implementation runs as a decision support tool, with contributions of an overwhelming reduction in human effort in crew schedule construction and a feasible and better (higher productivity rate) schedule, with possible further manual improvements that can be made. © 1998 Elsevier Science Ltd. All rights reserved.
Persistent Identifierhttp://hdl.handle.net/10722/75132
ISSN
2021 Impact Factor: 5.159
2020 SCImago Journal Rankings: 1.506
ISI Accession Number ID
References

 

DC FieldValueLanguage
dc.contributor.authorChu, SCKen_HK
dc.contributor.authorChan, ECHen_HK
dc.date.accessioned2010-09-06T07:08:14Z-
dc.date.available2010-09-06T07:08:14Z-
dc.date.issued1998en_HK
dc.identifier.citationComputers And Operations Research, 1998, v. 25 n. 11, p. 887-894en_HK
dc.identifier.issn0305-0548en_HK
dc.identifier.urihttp://hdl.handle.net/10722/75132-
dc.description.abstractThis work concerns the problem of crew scheduling for the Hong Kong Light Rail Transit (LRT), which together with Heavy Rail Transit, makes up the two divisions of Kowloon-Canton Railway Corporation. As of early 1996, LRT operates eight routes, two train depots and 57 stations on its operational network. It is rapidly expanding on routes, capacities and territorial coverage, hence pressing needs for timely constructions of crew schedules whenever passenger demand variations necessitate modifications in train timetables, typically every 3-4 months. Computer-assisted manual solutions from old software can take up to 1 month of painstaking work. Our project aims at automating this complex schedule construction, adopting a novel optimization modeling approach amenable for decomposition into separate solution stages by network and heuristics algorithms. The entire crew schedule can be constructed iteratively in less than half an hour on a PC. The implementation runs as a decision support tool, with contributions of an overwhelming reduction in human effort in crew schedule construction and a feasible and better (higher productivity rate) schedule, with possible further manual improvements that can be made. © 1998 Elsevier Science Ltd. All rights reserved.en_HK
dc.languageengen_HK
dc.publisherPergamon. The Journal's web site is located at http://www.elsevier.com/locate/coren_HK
dc.relation.ispartofComputers and Operations Researchen_HK
dc.subjectCrew schedulingen_HK
dc.subjectHeuristicsen_HK
dc.subjectOptimization modelingen_HK
dc.titleCrew scheduling of light rail transit in Hong Kong: From modeling to implementationen_HK
dc.typeArticleen_HK
dc.identifier.openurlhttp://library.hku.hk:4550/resserv?sid=HKU:IR&issn=0305-0548&volume=25&spage=887&epage=894&date=1998&atitle=Crew+Scheduling+of+Light+Rail+Transit+in+Hong+Kong:+from+modeling+to+implementationen_HK
dc.identifier.emailChu, SCK:schu@hkucc.hku.hken_HK
dc.identifier.authorityChu, SCK=rp00685en_HK
dc.description.naturelink_to_subscribed_fulltext-
dc.identifier.doi10.1016/S0305-0548(98)00030-6-
dc.identifier.scopuseid_2-s2.0-0032210281en_HK
dc.identifier.hkuros46869en_HK
dc.relation.referenceshttp://www.scopus.com/mlt/select.url?eid=2-s2.0-0032210281&selection=ref&src=s&origin=recordpageen_HK
dc.identifier.volume25en_HK
dc.identifier.issue11en_HK
dc.identifier.spage887en_HK
dc.identifier.epage894en_HK
dc.identifier.isiWOS:000075284000002-
dc.publisher.placeUnited Kingdomen_HK
dc.identifier.scopusauthoridChu, SCK=7403619384en_HK
dc.identifier.scopusauthoridChan, ECH=7401994079en_HK
dc.identifier.issnl0305-0548-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats