Article: Computation of milestones for decision support during system restoration

TitleComputation of milestones for decision support during system restoration
Authors
KeywordsGeneric restoration milestones
Optimization
Power system restoration
Issue Date2011
PublisherI E E E. The Journal's web site is located at http://ieeexplore.ieee.org/xpl/RecentIssue.jsp?punumber=59
Citation
IEEE Transactions on Power Systems, 2011, v. 26 n. 3, p. 1399-1409 How to Cite?
AbstractSystem restoration involves status assessment, optimization of generation capability, and load pickup. The optimization problem needs to take complex constraints into consideration, and therefore, it is not practical to formulate the problem as one single optimization problem. The other critical consideration for the development of decision support tools is its generality, i.e., the tools should be portable from a system to another with minimal customization. This paper reports a practical methodology for construction of system restoration strategies. The strategy adopted by each power system differs, depending on system characteristics and policies. A new method based on the concept of generic restoration milestones (GRMs) is proposed. A specific restoration strategy can be synthesized by a combination of GRMs based on the actual system conditions. The decision support tool is expected to reduce the restoration time, thereby improving system reliability. The proposed decision support tool has been validated with cases based on a simplified Western Electricity Coordinating Council (WECC) 200-Bus system and Hawaiian Electric Company system. © 2011 IEEE.
Persistent Identifierhttp://hdl.handle.net/10722/133612
ISSN
2021 Impact Factor: 7.326
2020 SCImago Journal Rankings: 3.312
ISI Accession Number ID
Funding AgencyGrant Number
Electric Power Research Institute (EPRI)
Research Grant Council, Hong Kong SAR7124/10E
Funding Information:

This work was supported by the Electric Power Research Institute (EPRI) and the Research Grant Council, Hong Kong SAR, under Grant 7124/10E. Paper no. TPWRS-00173-2010.

References

 

DC FieldValueLanguage
dc.contributor.authorHou, Yen_HK
dc.contributor.authorLiu, CCen_HK
dc.contributor.authorSun, Ken_HK
dc.contributor.authorZhang, Pen_HK
dc.contributor.authorLiu, Sen_HK
dc.contributor.authorMizumura, Den_HK
dc.date.accessioned2011-05-24T02:11:59Z-
dc.date.available2011-05-24T02:11:59Z-
dc.date.issued2011en_HK
dc.identifier.citationIEEE Transactions on Power Systems, 2011, v. 26 n. 3, p. 1399-1409en_HK
dc.identifier.issn0885-8950en_HK
dc.identifier.urihttp://hdl.handle.net/10722/133612-
dc.description.abstractSystem restoration involves status assessment, optimization of generation capability, and load pickup. The optimization problem needs to take complex constraints into consideration, and therefore, it is not practical to formulate the problem as one single optimization problem. The other critical consideration for the development of decision support tools is its generality, i.e., the tools should be portable from a system to another with minimal customization. This paper reports a practical methodology for construction of system restoration strategies. The strategy adopted by each power system differs, depending on system characteristics and policies. A new method based on the concept of generic restoration milestones (GRMs) is proposed. A specific restoration strategy can be synthesized by a combination of GRMs based on the actual system conditions. The decision support tool is expected to reduce the restoration time, thereby improving system reliability. The proposed decision support tool has been validated with cases based on a simplified Western Electricity Coordinating Council (WECC) 200-Bus system and Hawaiian Electric Company system. © 2011 IEEE.en_HK
dc.languageengen_US
dc.publisherI E E E. The Journal's web site is located at http://ieeexplore.ieee.org/xpl/RecentIssue.jsp?punumber=59en_HK
dc.relation.ispartofIEEE Transactions on Power Systemsen_HK
dc.rights©2010 IEEE. Personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution to servers or lists, or to reuse any copyrighted component of this work in other works must be obtained from the IEEE.-
dc.subjectGeneric restoration milestonesen_HK
dc.subjectOptimizationen_HK
dc.subjectPower system restorationen_HK
dc.titleComputation of milestones for decision support during system restorationen_HK
dc.typeArticleen_HK
dc.identifier.openurlhttp://library.hku.hk:4550/resserv?sid=HKU:IR&issn=0885-8950&volume=&spage=&epage=&date=2010&atitle=Computation+of+milestones+for+decision+support+during+system+restoration-
dc.identifier.emailHou, Y:yhhou@eee.hku.hken_HK
dc.identifier.authorityHou, Y=rp00069en_HK
dc.description.naturepublished_or_final_version-
dc.identifier.doi10.1109/TPWRS.2010.2089540en_HK
dc.identifier.scopuseid_2-s2.0-79960891798en_HK
dc.identifier.hkuros185130en_US
dc.relation.referenceshttp://www.scopus.com/mlt/select.url?eid=2-s2.0-79960891798&selection=ref&src=s&origin=recordpageen_HK
dc.identifier.volume26en_HK
dc.identifier.issue3en_HK
dc.identifier.spage1399en_HK
dc.identifier.epage1409en_HK
dc.identifier.isiWOS:000293711700044-
dc.publisher.placeUnited Statesen_HK
dc.identifier.scopusauthoridHou, Y=7402198555en_HK
dc.identifier.scopusauthoridLiu, CC=25927307000en_HK
dc.identifier.scopusauthoridSun, K=7401518666en_HK
dc.identifier.scopusauthoridZhang, P=35101209200en_HK
dc.identifier.scopusauthoridLiu, S=44761316600en_HK
dc.identifier.scopusauthoridMizumura, D=36667111700en_HK
dc.identifier.issnl0885-8950-

Export via OAI-PMH Interface in XML Formats


OR


Export to Other Non-XML Formats