File Download
There are no files associated with this item.
Links for fulltext
(May Require Subscription)
- Publisher Website: 10.31705/WCS.2023.25
- Scopus: eid_2-s2.0-85174451746
Supplementary
-
Citations:
- Scopus: 0
- Appears in Collections:
Conference Paper: Building information modelling for construction productivity measurement
Title | Building information modelling for construction productivity measurement |
---|---|
Authors | |
Keywords | Building Information Modelling Construction Productivity Measurement Systematic Review |
Issue Date | 21-Jul-2023 |
Publisher | Ceylon Institute of Builders - Sri Lanka |
Abstract | Productivity is a critical performance indicator of the construction industry, and thus warrants effective and efficient construction productivity measurement (CPM). Building information modelling (BIM), a digital representation of the building process, plays a significant role in effective and efficient CPM. Considering the high mandatory requirements for enhancement in construction productivity measurement, this paper aims to review the state-of-the-art literature on BIM-integrated CPM, to identify gaps in the existing body of knowledge and explore future research trends. The aim is achieved through a systematic literature review and bibliometric analysis where the data are retrieved from Web of Science, Scopus, and Google Scholar and proposes future research directions. In total 260 publications were identified from the initial search, and 56 were shortlisted for full-text analysis after several levels of screening including duplication, title and abstract checking. Finally, 21 were narrowed yielded for detailed review for this study. The results mapped the yearly publication trend, publications by source and the co-occurrence of terms. The findings help to identify a suite of BIM-integrated CPM methods used in the construction industry and provide a foundation for future research in CPM. A framework is developed to illustrate the knowledge gap and future directions identified in this study. Accordingly, the findings revealed that existing studies on utilising BIM for CPM are limited to only 3D and 4D BIM. Further, there is a lack of studies on the feasibility of using BIM for CPM, fully automated BIM integrated CPM tools and real-time CPM through BIM. |
Persistent Identifier | http://hdl.handle.net/10722/342206 |
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Archchana, S | - |
dc.contributor.author | Pan, Wei | - |
dc.date.accessioned | 2024-04-17T03:49:59Z | - |
dc.date.available | 2024-04-17T03:49:59Z | - |
dc.date.issued | 2023-07-21 | - |
dc.identifier.uri | http://hdl.handle.net/10722/342206 | - |
dc.description.abstract | <p>Productivity is a critical performance indicator of the construction industry, and thus warrants effective and efficient construction productivity measurement (CPM). Building information modelling (BIM), a digital representation of the building process, plays a significant role in effective and efficient CPM. Considering the high mandatory requirements for enhancement in construction productivity measurement, this paper aims to review the state-of-the-art literature on BIM-integrated CPM, to identify gaps in the existing body of knowledge and explore future research trends. The aim is achieved through a systematic literature review and bibliometric analysis where the data are retrieved from Web of Science, Scopus, and Google Scholar and proposes future research directions. In total 260 publications were identified from the initial search, and 56 were shortlisted for full-text analysis after several levels of screening including duplication, title and abstract checking. Finally, 21 were narrowed yielded for detailed review for this study. The results mapped the yearly publication trend, publications by source and the co-occurrence of terms. The findings help to identify a suite of BIM-integrated CPM methods used in the construction industry and provide a foundation for future research in CPM. A framework is developed to illustrate the knowledge gap and future directions identified in this study. Accordingly, the findings revealed that existing studies on utilising BIM for CPM are limited to only 3D and 4D BIM. Further, there is a lack of studies on the feasibility of using BIM for CPM, fully automated BIM integrated CPM tools and real-time CPM through BIM.</p> | - |
dc.language | eng | - |
dc.publisher | Ceylon Institute of Builders - Sri Lanka | - |
dc.relation.ispartof | The 11th World Construction Symposium (21/07/2023-22/07/2023, , , Sri Lanka) | - |
dc.subject | Building Information Modelling | - |
dc.subject | Construction Productivity Measurement | - |
dc.subject | Systematic Review | - |
dc.title | Building information modelling for construction productivity measurement | - |
dc.type | Conference_Paper | - |
dc.identifier.doi | 10.31705/WCS.2023.25 | - |
dc.identifier.scopus | eid_2-s2.0-85174451746 | - |
dc.identifier.volume | 1 | - |
dc.identifier.spage | 293 | - |
dc.identifier.epage | 304 | - |